Electromechanical - Industrial Installations / Metro Systems

Lukoil Neftochim Burgas Refinery

KEY INFORMATION
Project Industrial Projects
Type Electromechanical - Industrial Installations / Metro Systems
Location Bulgaria

Total weight: 1.650 tons
Total length: 62.500 m
Diameters: 1/2" to 24"

  • Construction of a Hydrodesulphurization and Dearomatization unit HDS-HDA (XO-5).
  • Construction of a Gasoline Desulphurization - Prime G (XOB-1).
  • Civil works: Procurement of materials and construction of all civil works including a 7.000 m3 substation and satellite building.
  • Equipment erection: 3.200 tons.
  • Preparation of shop drawings and supply of material, fabrication and erection of steel structures of Ca 2.300 tons.
  • Piping & Carbon steel, Stainless steel, Alloy steel in accordance with PED (97/23/EC).
    • Electrical and I/C erection works total cable length 450.000 m.
    • Insulation: supply of materials and erection Ca 35.000 m2.
    • Pre-commissioning,Commissioning and Start-up activities for both units.